He looked at the logic.
He added the conditions. XIC Conveyor_Clear . He added a safety check, XIC E_Stop_Healthy . rslogix 500
The issue was in the Filler Control routine. Elias scrolled down to Rung 12. This was the heart of the problem. The logic was supposed to tell the filler: If the downstream conveyor is full, stop filling. If the conveyor clears, resume. He looked at the logic
Programming in RSLogix 500 involves placing rungs of logic that flow from the left rail to the right rail. Common Ladder Logic Symbols stop filling. If the conveyor clears
Elias verified the rungs. No errors.